For this project, our services included;

  • Complete strip out of existing Laboratories 
  • Corrective refurbish X6 laboratory benchtops in 2 pack sprayed finish 
  • New services ran throughout including; natural gas, medical gases - hydrogen, nitrogen, instrument air and carbon dioxide, body protected power, lighting control, mechanical, hydraulic and data 
  • Oxygen Monitoring Systems, Fume and Corrosive cupboards, Biosafety cabinets
  • Airtight sealing as per PC2 Laboratory regulations to Fermentation and Biology labs
  • Lay new resilient vinyl throughout 
  • Custom in-house built 2 pack sprayed architectural joinery

Client

Victoria University

Completed

2020

Architect

H2O Architects

Services Engineer

Lehr Consultants International

Building Surveyor

PLP Building Surveyors & Consultants